Skip to content
E
ERPResearch

Tulip Case Studies19 Customer Stories & Results

VEKA, Test Devices by SCHENCK, Reframe Systems and Zaleco are among the 19 companies with published Tulip stories. Most run it alongside SAP S/4HANA, and Manufacturing is the most common industry. Filter by industry or ERP below to find companies like yours.

19 customer stories11 with measured resultsUpdated August 2026

19

Customer stories

SAP S/4HANA

#1 ERP alongside

Manufacturing

#1 industry

United States

#1 country

Industries

  • Manufacturing7 (37%)
  • Aerospace & Defense3 (16%)
  • Medical Devices & Diagnostics3 (16%)
  • Automotive2 (11%)
  • Biotechnology1 (5%)
  • Construction1 (5%)
  • Industrial Products1 (5%)
  • Pharmaceuticals1 (5%)

Countries

  • United States8 (42%)
  • Europe1 (5%)
  • North America1 (5%)

Tulip customer success stories

Each story records the challenge, what Tulip replaced, the ERP it runs alongside and the results the vendor reported. Filter to find companies like yours.

Industry

TD

Test Devices by SCHENCK

Aerospace & Defense · United States

Mid-Market
Replaced Paper travelers and bindersLess than a year

50%

Volume Increase

79%

Admin Time Reduction

12,000

Parts Per Year After

Challenge

High-value aerospace parts (worth $20,000-$80,000 each) required complete documentation and traceability. Paper travelers and binders were inefficient as volumes increased. Risk of procedural errors during spin testing could scrap parts or damage equipment.

Results

Increased volume from 8,000 to 12,000 parts per year (50% increase), reduced administrative time by 79%, improved traceability, eliminated paper travelers, enabled faster quality decisions

Source ↗
V

VEKA

Manufacturing · United States

Mid-Market
Runs with SAP S/4HANAReplaced Paper forms, disconnected spreadsheets, homegrown MES

60%

Returns Reduction

10x

Mislabeling Reduction

88%

Quality Escapes Reduction

Challenge

Demand growth exposed quality risks. Paper forms, disconnected spreadsheets, and manual documentation dominated. Mislabeling incidents surged to 540 in a single year. Gap between physical production and digital progression in SAP S/4HANA caused mismatched labels.

Results

Reduced mislabeling by 10x, cut quality escapes by 88%, achieved 60% drop in returns, improved traceability, scaled to 4 facilities (Pennsylvania, Texas, Nevada, North Carolina)

Source ↗
AE

Autonomous Electric Aircraft Manufacturer

Aerospace & Defense · United States

Enterprise

2 days

Assembly Time After

10 days

Assembly Time Before

80%

Assembly Time Reduction

Challenge

As production scaled, long build cycles and frequent engineering changes pushed manufacturing to evolve. Needed to seamlessly integrate evolving engineering specifications into consistent and efficient manufacturing workflow.

Results

Engineering changes roll out 75% faster, final assembly time dropped 80% (from 10 days to 2 days), achieved real-time visibility into airplane build progress and improved delivery schedule management

Source ↗
RS

Reframe Systems

Construction · United States

Mid-Market
Replaced Paper-based processes, binders with diagrams, manual coordination

2.5x

Speed Improvement

3-4 months factory production

Construction Time Reframe

6-18 months

Construction Time Traditional

Challenge

Traditional home construction is inefficient with manual processes, material waste, and slow iteration cycles. Needed to integrate design and production, reduce errors, and support real-time collaboration while providing traceability for regulatory compliance.

Results

Achieved 2.5x faster home construction, reduced need for skilled labor through clear visual instructions, improved design iteration speed (9 minutes from issue identification to operator guidance), expanded beyond factory to field installation with mobile apps, created 3,500+ work instructions for a Triple Decker project

Source ↗
RR

RFK Racing (Roush Fenway Keselowski Racing)

Automotive · United States

Mid-Market
Replaced Excel spreadsheets and siloed databasesSeveral months

3 NASCAR Cup Series teams

Teams

46,000+

Parts Tracked

Challenge

NASCAR teams must rebuild race cars weekly with zero errors, managing tens of thousands of parts with tight tolerances (1.5mm body panels). Previous Excel-based tracking was inadequate. After races, all components require rigorous inspection and re-approval with traceability proof. Scaling to a third car required removing friction from existing processes.

Results

Achieved 100% parts traceability (46,000+ parts in database), streamlined car assembly workflows, enabled real-time NASCAR compliance documentation, created data-driven advantage for compliance, moved from manual reactive mindset to connected proactive operations in months not years, added third car successfully

Source ↗
ML

Multinational Life Sciences Corporation

Medical Devices & Diagnostics

Enterprise
Under 3 months

15

Sites Deployed

under 3 months

Deployment Timeline

Challenge

Multinational life sciences corporation faced new regulatory requirements for orthopedic surgical kit distribution across field inventory department.

Results

Implemented eLogbooks across 15 sites in under 3 months, ensuring regulatory compliance

Source ↗
I

Innovafeed

Biotechnology

Mid-Market
Replaced Disconnected digital tools

500%

Production Growth

Challenge

Rapidly evolving processes required flexible solution. Disconnected digital tools created gaps. Lack of standardization across work centers. Demand for full traceability and automation.

Results

Achieved 500% production growth with unified systems and traceability

Source ↗
Z

Zaleco

Manufacturing · Europe

Mid-Market

20%

Scrap Rate Reduction

Challenge

European packaging manufacturer needed better quality control for smart engineered packaging solutions across automotive, telecom, electronics, and furniture markets.

Results

Reduced scrap rate by 20% through improved in-process quality control

Source ↗
F

Formlabs

Manufacturing

Mid-Market
Replaced Paper-based processes

20%

Lead Time Reduction

Challenge

3D printing manufacturer needed to improve built-to-order facility operations and reduce lead times for customized parts.

Results

Reduced lead time by 20% in customized 3D-printed parts production

Source ↗

Tulip case studies by industry

Tulip in Manufacturing

7 stories · 60% returns reduction

VEKA, Zaleco, Formlabs, DMG Mori and 3 more.

Read VEKA's story ↓

Tulip in Aerospace & Defense

3 stories · 50% volume increase

Test Devices by SCHENCK, Autonomous Electric Aircraft Manufacturer, Pratt Miller Engineering (Oshkosh Corporation).

Read Test Devices by SCHENCK's story ↓

Tulip in Medical Devices & Diagnostics

3 stories · 15 sites deployed

Multinational Life Sciences Corporation, Personalized Prosthetic Arm Manufacturer, Laerdal Medical.

Read Multinational Life Sciences Corporation's story ↓

Tulip in Automotive

2 stories · 3 NASCAR Cup Series teams teams

RFK Racing (Roush Fenway Keselowski Racing), TICO Tractors.

Read RFK Racing (Roush Fenway Keselowski Racing)'s story ↓

Evaluating Tulip?

See features, integrations, pricing and the alternatives buyers shortlist against it.

View the Tulip profile →

Where this data comes from

These stories are summarised from Tulip Interfaces's own published customer stories, with the customer, industry, prior system and stated ERP extracted from each page. Figures are the vendor's claims and are not independently verified by ERP Research — treat them as directional, and ask for references covering your industry and ERP when you shortlist. Every card links to its original source.