Skip to content
E
ERPResearch

EasyPost Case Studies19 Customer Stories & Results

Winestyr, Radio Flyer, Kase and QALO are among the 19 companies with published EasyPost stories., and Retail is the most common industry. Filter by industry or ERP below to find companies like yours.

19 customer stories13 with measured resultsUpdated August 2026

19

Customer stories

#1 ERP alongside

Retail

#1 industry

United States

#1 country

Industries

  • Retail8 (42%)
  • Logistics3 (16%)
  • Manufacturing3 (16%)
  • Software3 (16%)
  • E-commerce2 (11%)

EasyPost customer success stories

Each story records the challenge, what EasyPost replaced, the ERP it runs alongside and the results the vendor reported. Filter to find companies like yours.

Industry

RF

Radio Flyer

Manufacturing · United States

Mid-Market
Replaced Direct carrier integrations with limited capacity1-2 months for full integration

4x

Capacity Increase

4000

Daily Shipments After

800-1000

Daily Shipments Before

Challenge

Struggling to keep up with growing consumer demand; establishing carrier relationships was time-consuming and tedious, resulting in restrictive shipping capacity

Results

Quadrupled shipping capacity from 800-1,000 packages per day to 4,000; enabled batch shipping of 250 shipments via CSV

Source ↗
W

Winestyr

Retail · United States

SMB
Replaced Manual copying and pasting between systems

10%

Efficiency Gain

200+ hours

Annual Time Savings

10000+

Shipments Peak Season

Challenge

Manual copying and pasting between systems became difficult as company grew, need for automated shipping process

Results

200+ hours saved annually, 10% efficiency boost, processed 10,000+ shipments during peak season

Source ↗
ZO

Zenni Optical

Retail · United States

SMB
Replaced Manual system requiring computer per station

2 hours per shift per day

Time Savings

$5,400

Annual Downtime Savings

Challenge

Previously needed a computer for each station, lost tracking numbers by downloading repeatedly, high downtime costs (2-3 times per year with 12 hours of downtime each)

Results

2 hours saved per shift, real-time tracking enabled, $5,400 annual savings in estimated downtime, improved employee productivity monitoring

Source ↗
SM

Sticker Mule

Retail · United States

Enterprise
Replaced State-by-state shipping optimization approach13 days

$6,000

Monthly Savings

13

Implementation Days

Challenge

Need to optimize shipping decisions between service levels by zip code rather than state level, had wanted to conduct analysis but lacked time and resources

Results

$6,000 monthly savings, customers receive packages faster than ever, maintained or improved on-time delivery

Source ↗
K

Kase

Logistics · United States

Mid-Market
Minutes to integrate Amazon Shipping

10%

Cost Reduction

7-day service in many ZIP codes

Delivery Options

Challenge

Rising costs, mounting surcharges, strained delivery networks; need to maintain premium experience while protecting profit margins

Results

10% shipping cost reduction, improved delivery timelines, maintained premium customer experience, access to Amazon Shipping's vast logistics network

Source ↗
S

ShipBob

Logistics · United States

Mid-Market

10+ million

Orders

99.99%

Api Uptime

Challenge

Need flexible technology to scale with business, support diverse carrier options, handle returns management and international expansion

Results

Scaled to serve thousands of brands and process millions of orders with one-stop shipping solution

Source ↗
Q

QALO

Manufacturing · United States

SMB
Replaced Manual exchange process

Up to 10%

Return Rate

7-14 days to 2-5 days

Exchange Reduction

Challenge

High return rate (10% of customers), manual exchange process taking 7-14 days, heavy operational load

Results

Reduced exchange time from 7-14 days to 2-5 days; automated scalable process eliminating manual support involvement

Source ↗
T

Teespring

E-commerce · United States

Mid-Market
Replaced Manual label purchasing and address correctionFew days

Hundreds of thousands of packages

Scale

2x

Shipment Growth

Challenge

Building out shipping systems was a major pain point; address correction took full developer time; unwieldy carrier APIs

Results

Eliminated manual address correction, went live in days, 2x shipment growth without additional engineering investment

Source ↗
S

SKULabs

Software · United States

Mid-Market
Replaced Multiple individual carrier integrations

$0.01

Label Cost

100+

Carriers Integrated

Challenge

Lengthy integrations (3 month average), inconsistencies with label generation, need to maintain support for growing number of carriers

Results

Single integration for 100+ carriers, faster customer onboarding, reduced engineering overhead for shipping

Source ↗

EasyPost case studies by industry

EasyPost in Retail

8 stories · 10% efficiency gain

Winestyr, Zenni Optical, Sticker Mule, Yamibuy and 4 more.

Read Winestyr's story ↓

EasyPost in Logistics

3 stories · 10% cost reduction

Kase, ShipBob, CourierGateway.

Read Kase's story ↓

EasyPost in Manufacturing

3 stories · 4x capacity increase

Radio Flyer, QALO, Printful.

Read Radio Flyer's story ↓

EasyPost in Software

3 stories · $0.01 label cost

SKULabs, Packiyo, XPS Ship.

Read SKULabs's story ↓

EasyPost in E-commerce

2 stories · Hundreds of thousands of packages scale

Teespring, Massdrop.

Read Teespring's story ↓

Evaluating EasyPost?

See features, integrations, pricing and the alternatives buyers shortlist against it.

View the EasyPost profile →

Where this data comes from

These stories are summarised from EasyPost's own published customer stories, with the customer, industry, prior system and stated ERP extracted from each page. Figures are the vendor's claims and are not independently verified by ERP Research — treat them as directional, and ask for references covering your industry and ERP when you shortlist. Every card links to its original source.